Metal structures
Installation works at Vantaa Airport
Helsinki, Finland
Installation of Ground Run-up Enclosure and Jet Blast Deflector as part of the airport infrastructure. Dimensions of wall constructions: 107x104x18m. Assembly of wall constructions: 292 tons. Dimensions of Jet Blast Deflector: 60x15m. Assembly of Jet Blast Deflector: 105 tons. Installation of acoustic panels: 4050m2. Installation of profiled metal sheets: 4350m2.
PLACE
Helsinki, Finland